K sequence Parallel Shaft-Helical Geared Motor Traits
1. Functions:
- Large performance: ninety two%-ninety three%
- Vertical output, compact structure, tough tooth area , huge output torque, low noise and long provider existence.
- Higher precision: the equipment is produced of large-high quality alloy metal forging, carbonitriding and hardening remedy, grinding method to guarantee high precision and steady operating.
- Higher interchangeability: highly modular, serial layout, powerful versatility and interchangeability.
2. CZPT parameters
Ratio | 5.36-197.37 |
Input electricity | .twelve-200KW |
Output torque | ten-62800N.m |
Output pace | seven-415rpm |
Mounting type | Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Strategy | Flange input(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-guide launch(lock in the brake release place), HR-guide launch(autom-atic braking situation) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Kind | K37-K157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing content | HT200 high-power cast iron from R37,forty seven,fifty seven,67,77,87 |
Housing substance | HT250 Higher energy forged iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment method |
Solitary Phase Efficiency | up to 96% |
CZPT | VG220 |
CZPT Course | IP55, F class |
CZPTshine CZPT
ZheJiang CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned army mould company, was established in 1965. CZPTshine specializes in the comprehensive electrical power transmission answer for high-conclude products producing industries based on the goal of “System Solution, Application Design and Skilled Services”.
CZPTshine have a robust technical drive with in excess of 350 workers at existing, like over 30 engineering technicians, 30 top quality inspectors, covering an area of 80000 sq. meters and types of sophisticated processing equipment and tests equipments. We have a very good basis for the business software growth and services of substantial-finish speed reducers & variators possessing to the provincial engineering technology analysis middle,the lab of gear pace reducers, and the base of modern day R&D.
Our Crew
CZPT Control
CZPT:Insist on Improvement,Strive for CZPT With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
CZPT policy:to enhance the overall level in the field of power transmission
CZPT View:Continuous Improvement , pursuit of excellence
CZPT Philosophy:CZPT creates value
three. Incoming CZPT Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, subCZPT goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process CZPT Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
All our products get ISO & CE & UL certification.
Packing
Supply